Good News on Infrastructure thread

Our Community Forums General Discussion Good News on Infrastructure thread

Viewing 15 posts - 61 through 75 (of 606 total)
  • Author
    Posts
  • #1006142
    CaseyKane50
    Participant

    @CaseyKane50 85805 wrote:

    Lane markings On the Mount Vernon Trail have been repainted from the Washington Sailing Marina to at least the Crystal City connector.

    [ATTACH=CONFIG]5660[/ATTACH]

    More line stripping on the MVT today.

    North from First Street towards the Washington Sailing Marina. They also were stripping the alternate trail towards Slaters Lane.

    [ATTACH=CONFIG]6210[/ATTACH]

    [ATTACH=CONFIG]6211[/ATTACH]

    #1006168
    chris_s
    Participant

    The north-side Arlington Blvd Trail is open through the 10th St / N Courthouse Road construction project. Here is a video starting at the Washington Blvd Trailhead in Penrose, going along onto the Arlington Blvd Trail all the way to Rosslyn. The new part of the trail starts around 1:25.

    https://www.youtube.com/watch?v=vNwxHx1LWfg&feature=youtu.be

    #1006216
    dasgeh
    Participant

    @chris_s 90553 wrote:

    The north-side Arlington Blvd Trail is open through the 10th St / N Courthouse Road construction project. Here is a video starting at the Washington Blvd Trailhead in Penrose, going along onto the Arlington Blvd Trail all the way to Rosslyn. The new part of the trail starts around 1:25.

    https://www.youtube.com/watch?v=vNwxHx1LWfg&feature=youtu.be

    ON MY GOSH! OH MY GOSH! OH MY GOSH! It’s like Christmas (ok, not really Christmas, but another holiday where you get things you like, though not your top priorities — Easter! It’s like Easter!). I realize that many of you don’t avoid hills because hills, but for anyone who does want to avoid the horribleness that is Rosslyn Hill with a lodaded cargo bike, or out of shape legs, or a bum knee or whatever, this is AMAZING!!! It allows a gentle slope connection between bottom-of-the-hill Rosslyn (and through that, DC, etc) and Clarendon and points west.

    HOORAY! This could only be made better if you all say you’re going on the KIDICAL MASS ARLINGTON AND KIDICAL MASS ALEXANDRIA RIDE ON SUNDAY!!! 11am Eclipse Potomac Yard Arlington

    #1006221
    americancyclo
    Participant

    @chris_s 90553 wrote:

    The north-side Arlington Blvd Trail is open through the 10th St / N Courthouse Road construction project. Here is a video starting at the Washington Blvd Trailhead in Penrose, going along onto the Arlington Blvd Trail all the way to Rosslyn. The new part of the trail starts around 1:25.

    https://www.youtube.com/watch?v=vNwxHx1LWfg&feature=youtu.be

    Is there a map? I don’t really understand where this is.

    #1006236
    chris_s
    Participant

    @americancyclo 90611 wrote:

    Is there a map? I don’t really understand where this is.

    trail.gif

    Detail

    #1006237
    chris_s
    Participant

    @dasgeh 90606 wrote:

    ON MY GOSH! OH MY GOSH! OH MY GOSH! It’s like Christmas (ok, not really Christmas, but another holiday where you get things you like, though not your top priorities — Easter! It’s like Easter!). I realize that many of you don’t avoid hills because hills, but for anyone who does want to avoid the horribleness that is Rosslyn Hill with a lodaded cargo bike, or out of shape legs, or a bum knee or whatever, this is AMAZING!!! It allows a gentle slope connection between bottom-of-the-hill Rosslyn (and through that, DC, etc) and Clarendon and points west.

    Beware: riding the new section makes it starkly clear what abysmal condition the rest of it is in. Also, good luck fitting the Bakfiets through the bushes in front of the Days Inn, or past the bollard at the end of the Days Inn Parking Lot Access Road.

    #1006268
    lordofthemark
    Participant
    #1006274
    Terpfan
    Participant

    I have no hyperlink, but they installed some bike parking at the bottom of 33rd rd at M in Georgetown. Two or three horseshoe types and then it looked half squares. I’ll try to remember to take a photo tomorrow.

    #1006434
    chris_s
    Participant

    Whatever you’d like to call it – the “Country Club Connector”, “Hoffman-Boston Connector”, “Arlington View Emergency Access Road” or whatever…is finally in an adopted Capital Improvement Plan. It’s still years out, but at least it has a timeline now. For those unfamiliar, it would be an access for Emergency Vehicles and a bike/ped connection between the Arlington View Neighborhood on the East end of Columbia Pike to the Army Navy Country Club Access Road running beneath I-395 to the Arlington Ridge Neighborhood. Map here.

    #1006438
    Harry Meatmotor
    Participant

    Not sure if this has been posted elsewhere but NomaBID installed 5 Fixit Station in the BID:

    https://www.flickr.com/photos/nomabid/sets/72157645771942196

    #1006486
    CaseyKane50
    Participant

    Milling and repaving work is on-going on Hayes Street between 15th and Fern Street. Work is scheduled to be completed by Friday, in the meantime, expect delays and rough pavement.

    [ATTACH=CONFIG]6255[/ATTACH]

    [ATTACH=CONFIG]6256[/ATTACH]

    #1007392
    chris_s
    Participant

    The 4 metal bollards referenced above on the Arlington Blvd Trail between Washington Blvd & Pershing have all been removed courtesy of the hard working folks at Arlington Parks & Rec. Enjoy your significantly lower-hazard trail experience.

    #1007394
    Tim Kelley
    Participant

    I’ll pass along the kudos!

    #1008143
    CaseyKane50
    Participant

    The repaving of Hayes Street between 15th And Fern is complete and the County is in the process of finishing up new separated bike lanes!

    Beginning of bike lane (headed towards Crystal City)

    [ATTACH=CONFIG]6433[/ATTACH]

    Parking spaces and bike lane

    [ATTACH=CONFIG]6434[/ATTACH]

    Bike lane at Intersection with Fern Street

    [ATTACH=CONFIG]6435[/ATTACH]

    Cars will have to learn that the narrow lane is for bikes!

    [ATTACH=CONFIG]6436[/ATTACH]

    #1008146
    KLizotte
    Participant

    I’m a little shocked at the new lanes on S Hayes Street. They are taking out parking spaces!!!!! 😮 It is gonna be so nice when it is done; hopefully the meters will be taken out soon and no parking signs will be put up.

Viewing 15 posts - 61 through 75 (of 606 total)
  • You must be logged in to reply to this topic.