Trail closed under Roosevelt Bridge — 10/2/18

Our Community Forums Road and Trail Conditions Trail closed under Roosevelt Bridge — 10/2/18

Viewing 15 posts - 1 through 15 (of 52 total)
  • Author
    Posts
  • #920675
    pmf
    Participant

    Some moron construction workers attempted to drive a piece of machinery under the Roosevelt bridge on the wood raised section and it fell through. If you’re headed south from Rosslyn, the only way across the river after the Key Bridge is Roosevelt.

    Something tells me that its going to take a while to get this fixed. Any updates appreciated.

    And I thought the stair detour at the 14-th street bridge sucked.

    #1090242
    huskerdont
    Participant

    @pmf 181607 wrote:

    Some moron construction workers attempted to drive a piece of machinery under the Roosevelt bridge on the wood raised section and it fell through. If you’re headed south from Rosslyn, the only way across the river after the Key Bridge is Roosevelt.

    Something tells me that its going to take a while to get this fixed. Any updates appreciated.

    And I thought the stair detour at the 14-th street bridge sucked.

    Wow, what an incredibly bad time for this to happen. Thank you for the alert though since that’s regular route home.

    #1090244
    trey197
    Participant

    Whoops. Photo credit to a coworker.
    [ATTACH=CONFIG]18437[/ATTACH][ATTACH=CONFIG]18438[/ATTACH]

    #1090246
    DrP
    Participant

    I saw them unloading that beast in the Roosevelt parking lot 7:30ish. I was wondering where it was going.

    What engineer approved that? Sigh.

    So, is this a chance to get a better trail than slippery wood?

    #1090247
    pmf
    Participant

    @trey197 181615 wrote:

    Whoops. Photo credit to a coworker.
    [ATTACH=CONFIG]18437[/ATTACH][ATTACH=CONFIG]18438[/ATTACH]

    How did he get that close? I rode up there to take a look and the moron in charge started yelling at me for crossing the yellow tape. At that point, around 8:45, they appeared clueless about what to do next. How could anyone be dumb enough to drive that heavy machine down that wood walkway?

    Were they working on removing that machine?

    It would be nice to get a better surface on that part of the trail. It owes my wife a rotator cuff surgery. But how would they detour us? Remember the detour when they were building the new parking lot at Roosevelt Island? That muddy strip covered with mulch. Anything …. gravel, plywood … would have been better than mulch.

    #1090248
    KWL
    Participant

    The GWMP folks claim it is “currently being repaired.”

    #1090249
    LeprosyStudyGroup
    Participant

    This is so absurd it’s hard not to laugh.

    Somebody gonna take out the key bridge with a barge tomorrow? Then we can all ride up to chain bridge for our commutes to crystal city.

    #1090250
    pmf
    Participant

    Thanks. I hope they get it fixed. My commute to Vienna is already long enough without looping through DC, or riding past the airport.

    #1090251
    Emm
    Participant

    The stupidity it required to drive a heavy piece of equipment over that wooden bridge is mind-blowing. I luckily don’t have to use it as part of my commute, but if I did, I’d be seriously pissed off right now. Skipping that section requires biking through Rosslyn, and then crossing the GWMP at those unsafe crossings. It’s not an easy, fast, or very safe detour.

    #1090252
    KWL
    Participant

    @Emm 181623 wrote:

    The stupidity it required to drive a heavy piece of equipment over that wooden bridge is mind-blowing. I luckily don’t have to use it as part of my commute, but if I did, I’d be seriously pissed off right now. Skipping that section requires biking through Rosslyn, and then crossing the GWMP at those unsafe crossings. It’s not an easy, fast, or very safe detour.

    If’n I was still commuting that way, I would just consider it a preview of this winter when the MVT isn’t cleared.

    #1090257
    PeteD
    Participant

    #replacenotrepair

    #1090258
    Megan2007
    Participant

    @PeteD 181629 wrote:

    #replacenotrepair

    I agree. I crashed on this stupid wooden bridge last week and fractured my knee.

    #1090259
    OneEighth
    Participant

    Sorry. Confused as to exactly where the damage is. Is this on the section under the bridge? Meaning, they severed the route between the Roosevelt Island parking lot and the Memorial Bridge?

    #1090260
    Zack
    Participant

    The Park Service could terminate the equipment operator’s contract for convenience at no cost to the government because the contractor clearly and obviously ignored any safety precautions. There are no barriers compliant with ADA regulations either so my visually-impaired friends would fall right into this equipment.

    #1090262
    pmf
    Participant

    @KWL 181624 wrote:

    If’n I was still commuting that way, I would just consider it a preview of this winter when the MVT isn’t cleared.

    Living out in Vienna means that when it snows, I don’t ride. You guys in Arlington are spoiled with the county plowing the bike path. I remember one year when VDOT had the bright idea of dumping all the snow that was accumulating on the side of I-66 onto the bike path that ran below it. Took forever for that to melt.

Viewing 15 posts - 1 through 15 (of 52 total)
  • You must be logged in to reply to this topic.