Potomac Yard – Four Mile Run Trail Connection Construction
Our Community › Forums › General Discussion › Potomac Yard – Four Mile Run Trail Connection Construction
- This topic has 23 replies, 9 voices, and was last updated 2 years, 6 months ago by
Judd.
-
AuthorPosts
-
January 24, 2022 at 3:27 am #1117581
chris_s
ParticipantA point of clarification, this won’t really connect to the Potomac Yard Trail until they build the park at some later date. This phase 1 trail connection connects to the Route 1 side only.
January 24, 2022 at 4:53 pm #1117502Judd
ParticipantWon’t get rid of the switchback this phase but it’s pretty easy to get from Route 1 to the Potomac Yard Trail on the sidewalk or the road access behind the apartment building.
I’m riding the long tail a lot these days and end up taking circuitous routes and crossing Route 1 to avoid the switchback.
Sent from my iPhone using Tapatalk
January 24, 2022 at 8:50 pm #1117281CaseyKane50
ParticipantWork was well underway this morning. The desire path from the Route 1 trail was blocked by the plastic silt control fencing.
January 30, 2022 at 6:11 pm #1118181kwarkentien
Participant“You kids get off my lawn!!!”
Don’t worry. Just kidding, even though this is my back “lawn.”
Glad to see this work taking place.
Sent from my iPhone using Tapatalk
January 30, 2022 at 6:19 pm #1118182kwarkentien
Participant@Judd 214567 wrote:
Won’t get rid of the switchback this phase but it’s pretty easy to get from Route 1 to the Potomac Yard Trail on the sidewalk or the road access behind the apartment building.
I’m riding the long tail a lot these days and end up taking circuitous routes and crossing Route 1 to avoid the switchback.
Sent from my iPhone using Tapatalk
[mention]Judd [/mention] , we snotty neighbors want you to know these are “condos” not “apartments” lest you believe we are so utterly plebeian as to be “renters.”
(Again kidding.) And so far, I have heard nary a disparaging word from folks here at The Eclipse about the proposed changes. Hopefully no dissent will be forthcoming.
Sent from my iPhone using Tapatalk
January 31, 2022 at 7:54 pm #1118056CaseyKane50
ParticipantMeanwhile, while Karen is stirring the pot over her lawn, construction has moved into the Alexandria portion of the park near the Four Mile Run Trail.
February 1, 2022 at 7:26 pm #1118323Boomer Cycles
ParticipantThe view from @handbagcycles backyard as of today’s lunch hour. Looks like she now has a 2nd bathroom!
Sent from Boomer_Cycles via my iPhone using Tapatalk
February 1, 2022 at 8:35 pm #1118324Judd
Participant@Boomer2U 215332 wrote:
The view from @handbagcycles backyard as of today’s lunch hour. Looks like she now has a 2nd bathroom!
Sent from Boomer_Cycles via my iPhone using Tapatalk
I didn’t know apartments had backyards.[emoji1787]
Sent from my iPhone using Tapatalk
February 1, 2022 at 9:22 pm #1118327lordofthemark
Participant@Judd 215333 wrote:
I didn’t know apartments had backyards.[emoji1787]
Sent from my iPhone using Tapatalk
Then how can I say “YES in my backyard!” ????
February 2, 2022 at 2:38 am #1118373kwarkentien
Participant@Boomer2U 215332 wrote:
The view from @handbagcycles backyard as of today’s lunch hour. Looks like she now has a 2nd bathroom!
Sent from Boomer_Cycles via my iPhone using Tapatalk
That would be a 3rd bathroom (a powder room). We live luxuriously here at The Eclipse at Center Park.
Sent from my iPhone using Tapatalk
August 3, 2022 at 8:13 pm #1121773CaseyKane50
ParticipantConcrete work has begun on the new path.
August 1
August 3
August 10, 2022 at 6:54 pm #1121820CaseyKane50
ParticipantMore progress on the South Park Short Bridge project. Spoke to a contractor this morning, weather permitting, they hope to be finished with the paving by the end of next week. He wasn’t sure when the trail would be open to the public.
View from Route 1 looking down towards the Four Mile Run Trail
Route 1 Trail looking south to Alexandria
Looking towards Route 1 from the new trail
August 15, 2022 at 3:33 pm #1121844chris_s
ParticipantJust tempering expectations here – if I recall correctly this is only going to connect over to Route 1 for now – the connection back to the Potomac Yard Trail won’t come until the park itself is built in 2025.
August 15, 2022 at 5:24 pm #1121838CaseyKane50
Participant@chris_s 219829 wrote:
Just tempering expectations here – if I recall correctly this is only going to connect over to Route 1 for now – the connection back to the Potomac Yard Trail won’t come until the park itself is built in 2025.
While there might not be a direct connection, I think some intrepid souls might replicate the desire path that was in place before construction began.
The desire path is in the general vicinity of the new trail
This part of the desire path is mere feet from the newtrail segment. The sidewalk leads to the Potomac Yard Trail
August 30, 2022 at 9:36 pm #1121869CaseyKane50
ParticipantThe concrete trail is finished, but more work remains, before the trail will be opened.
-