  • #922943
    CaseyKane50
    Participant

    The abutments for Holmes Run Trail Bridge at 4600 Duke have been completed. The contractor has been cleaning up the site. According to contractor staff, the replacement bridge is expected to be installed on October 5, 2023.

    0226c5228cd2be53dc931a08bc49aed3.jpg

    64765a8973c51962381e04b3fc377754.jpg
    a2b1f27b08cb400fefff129bc855f288.jpg

    #1126691
    arlcxrider
    Participant

    Enough riprap to build a jetty from here to the Moon. Maybe this one will be more flood-resilient.

    #1126693
    Starduster
    Participant

    @CaseyKane50 225923 wrote:

    The abutments for Holmes Run Trail Bridge at 4700 Duke have been completed. The contractor has been cleaning up the site. According to contractor staff, the replacement bridge is expected to be installed on October 5, 2023.

    0226c5228cd2be53dc931a08bc49aed3.jpg

    64765a8973c51962381e04b3fc377754.jpg
    a2b1f27b08cb400fefff129bc855f288.jpg

    Finally. Thank you Alexandria.

    Any updates on the washed out bridges further upstream?

    #1126694
    CaseyKane50
    Participant

    @Starduster 225926 wrote:

    Finally. Thank you Alexandria.

    Any updates on the washed out bridges further upstream?

    From the project website.

    • Holmes Run Trail at Dora Kelly Park – TBD (likely winter 2026) project will be coordinated with the design of a new bridge crossing to replace current fair weather crossing
    • Holmes Run Trail Bridge at Morgan Street cul-de-sac – anticipated start fall 2023, completion fall 2024
    • Holmes Run Trail Bridge at Ripley Street – anticipated start fall 2023, completion fall 2024
    #1126760
    CaseyKane50
    Participant

    Talked to a contractor staff person at the project site this morning, bridge is expected to open by July 31.

    12a089c57d6922f1e5fe6c77072c7246.jpg
    7adc355d82ece488936e1367471506cf.jpg
    50682fe9266e27a3c1f5808f65ca7e3d.jpg

    #1126775
    Fairlington124
    Participant

    Bridge was open as of 1 PM today (when I walked across it)

    #1126835
    Boomer Cycles
    Participant

    I rode across the bridge yesterday for the first time and it was great not to have to jump the curb to take the detour through the condo parking lot.
    [ATTACH=CONFIG]30874[/ATTACH]