4MRT in Dominion Hills Resurfacing

Our Community Forums Road and Trail Conditions 4MRT in Dominion Hills Resurfacing

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #1138114
    consularrider
    Participant

    According to a sign, the section between Arlington Mill Dr (after mm 1.5) and the intersection of N Madison and 4MR Dr (mm 1) will be closed starting March 23/25, 2025 for repaving, no duration given.  Easy detour on the W&OD.  It will be great to get rid of all the pavement heaves along that stretch.

    In addition, the trail crossing at Ohio Dr over to Madison Manor is currently closed (at least as far as bikes are concerned) as that intersection is redeveloped.  Work to continue through Fall 2025

    #1138201
    consularrider
    Participant

    Repaving is complete, nice and smooth, and it seems the trail is about a foot wider.  The new asphalt was just overlaid on the old with out grinding any layers off.  Good-bye root heaves!