Quincy Street Repaving – Washington Blvd to I66

Our Community Forums Arlington Bicycle Advisory Committee Quincy Street Repaving – Washington Blvd to I66

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #1098783
    accordioneur
    Participant

    I agree that Quincy could use a PBL from Custis into Ballston. Interestingly, the county’s repaving plan (the page to which your post links) omits Washington Blvd. to Fairfax Dr., which is a critical part of the Custis to Ballston link.

    #1098805
    Kolohe
    Participant

    The absolute minimum is to take advantage of the fact that 3 corners of the Quincy/Washington Blvd intersection are public land, so it should be completely unnecessary for the bike lane to end right at that spot. Which is the case now.

    #1098882
    dasgeh
    Participant

    @Kolohe 190982 wrote:

    The absolute minimum is to take advantage of the fact that 3 corners of the Quincy/Washington Blvd intersection are public land, so it should be completely unnecessary for the bike lane to end right at that spot. Which is the case now.

    Repaving doesn’t usually touch the curbs, so I doubt it’s likely we’ll get any change to the roadbed. Also, I’d be shocked if Arlington gave up school land for streets.

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.