@mstone 135902 wrote:
It isn’t clear that’s actually true. Is there an actual analysis of how much can be saved by rewriting the existing snow removal contract (are the lots broken out separately or is it basically a throw-in for doing everything else)? Is there an analysis of how much it would cost to acquire the trail clearing capability that doesn’t already exist? There’s a difference between a back of the envelope estimate of how much it would cost me to drive down a trail in a bobcat and the end result of the government procurement process.
The option of having NPS more effectively utilize current funding? Why, that is:
[ATTACH=CONFIG]11117[/ATTACH]