W&OD Trai Paving near Route 28 in Loudoun Co 4/6/2011

Our Community Forums Road and Trail Conditions W&OD Trai Paving near Route 28 in Loudoun Co 4/6/2011

  • Creator
    Topic
  • #909860
    FFX_Hinterlands
    Participant

    They had an off-pavement detour this AM. They were paving the ramps leading to and from the bridge. It’s good news because there were some nasty pavement cracks on the east side of the bridge. No one likes to slow down for a bump at the base of a hill!
    Photo: http://cot.ag/eFszwA

Viewing 4 replies - 1 through 4 (of 4 total)
  • Author
    Replies
  • #925512
    JimF22003
    Participant

    Ahh, that’s good. I’m riding out that way tonight after work. hate the detours, but love the fresh pavement :)

    Now when are they going to do the Custis trail from the W&OD down to Rosslyn???!?

    Got a stupid pinch flat last night riding on that mess….

    #925517
    Veik
    Participant

    Looks like they paved parts of WOD in Herndon as well…

    #925522
    JimF22003
    Participant

    They should have gone another 30 yards on the east side of the Rt 28 overpass… they would have fixed 3 or 4 more bad cracks and connected up with another section of newish pavement. Now there’s a dumb stretch of bad old pavement between the good stuff for no particular reason.

    Another job done to spec…

    #925523
    FFX_Hinterlands
    Participant

    @Jim… Can you believe they stopped before the biggest of the cracks on the East side? Killing me.

Viewing 4 replies - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.