W&OD Detours Coming Soon

Our Community Forums Road and Trail Conditions W&OD Detours Coming Soon

Viewing 5 posts - 91 through 95 (of 95 total)
  • Author
    Posts
  • #1100584
    dasgeh
    Participant

    @chris_s 193261 wrote:

    Big expensive bridge, that’s why it’s a long-term plan.

    To be specific, a bridge that more closely parallels the highway, probably going over the Metro station, Sycamore & the 66 on ramp.

    #1100586
    zsionakides
    Participant

    @dasgeh 193283 wrote:

    To be specific, a bridge that more closely parallels the highway, probably going over the Metro station, Sycamore & the 66 on ramp.

    I understand there was preference for the Lee Hwy bridge, but this bridge would have been much easier to build alongside the I-66 widening, vice as a separate project.

    #1100591
    mstone
    Participant

    @zsionakides 193285 wrote:

    I understand there was preference for the Lee Hwy bridge, but this bridge would have been much easier to build alongside the I-66 widening, vice as a separate project.

    The difference is that there was a chance of the lee hwy bridge getting built.

    #1104852
    Steve O
    Participant

    If you are following the detour signs, you are doing it wrong. Use the Columbia Street detour instead:

    http://bikearlingtonforum.com/showthread.php?15613-seeking-advice-on-Banneker-Park-detour

    #1105414
    zsionakides
    Participant

    I got an email and it looks like the Lee Hwy detour is opening back up to where the path is alongside the bridge again. I saw the new path last weekend and it was merely fenced off. This is a big relief to re-open what was probably the worst of the detours on the W&OD.

Viewing 5 posts - 91 through 95 (of 95 total)