June 11, 2012 at 6:13 pm #942637
consularrider
ParticipantThanks for the heads up, I’ll adjust my route.
Do I assume the paving between Lincoln and Lee Highway also refers to the Custis Trail?
June 18, 2012 at 2:50 pm #943346consularrider
ParticipantThe new fence along 4MRT just east of Columbia Pike looks good. The old rotted split rail fence has been replaced with a double green metal rails with wooden posts. I guess it is there to keep you from going over the trail edge and into the run?
June 18, 2012 at 7:46 pm #943384Tim Kelley
ParticipantMessage received today:
“Trail paving is scheduled to begin tomorrow 6/19. We are still waiting for confirmation from the contractor, but be prepared to detour in the area of Lincoln street to Lee Highway (at the “S” Curve)”
June 18, 2012 at 8:23 pm #943386dasgeh
Participant@Tim Kelley 22631 wrote:
be prepared to detour in the area of Lincoln street to Lee Highway (at the “S” Curve)”
Thanks, Tim. Do we know what the detour would be? Am I going to have company on Lee Hwy tomorrow?
June 18, 2012 at 11:38 pm #943395Tim Kelley
ParticipantI have not gotten any further information.
Make sure to take along a map or your smart phone if you think you might be get lost!
June 19, 2012 at 12:24 pm #943410Tim Kelley
ParticipantAnother update:
“Paving contractor will not start until Wednesday 6/20/12. Paving is expected to be complete by the weekend. Construction vehicles will be traveling on the trail between Lee Hwy and Lincoln during the project. Plan your alternate route or follow posted detour signs.”
June 19, 2012 at 7:07 pm #943455RESTONTODC
ParticipantI saw they’re putting up the detour sign around 9:30 this morning. I would be nice if they can wait after the morning rush hours to start.
June 19, 2012 at 7:15 pm #943457Tim Kelley
ParticipantAnother update:
“The Custis Trail will be closed for a probable 3 days starting 6/19/12 between the Lyon Village Shopping Center and Cherry Valley Park (near Quincy St) for the purpose of repaving. The detour is expected to utilize Quincy Street and Lee Highway to navigate people around the Trail construction area. There are areas of Street construction on both Quincy and Lee Highway so use extra caution in these areas. Detour signs will be posted. Commuters should allow themselves extra time to get to their destinations. Thank you for your patience while we make improvements to our trail system. “
June 19, 2012 at 7:19 pm #943458TwoWheelsDC
ParticipantI only take the Custis out to Lorcom so thankfully I don’t have to worry about this, but maybe tomorrow AM I’ll ride out to the detour area and investigate.
June 19, 2012 at 7:20 pm #943459GuyContinental
ParticipantThat could be an awkward detour if they shut down the whole Lincoln-Lee section… if you get there heading WB and it’s blocked head up Lee just a few blocks and take a left on N. Monroe (not Lincoln- it doesn’t connect)- there is a Dunkin’ Donuts there. Monroe will get you to the Beaver pond and back on the WO&D where it turns back into Lincoln. Alternatively, take Wilson to Fairfax and onto the WO&D at Ballston.
June 19, 2012 at 8:38 pm #943466consularrider
ParticipantOr join me on the long way around, MVT to 4MRT/W&OD. Come on, it only adds another six miles or so.
June 19, 2012 at 9:04 pm #943469RESTONTODC
Participant@consularrider 22717 wrote:
Or join me on the long way around, MVT to 4MRT/W&OD. Come on, it only adds another six miles or so.
I like the hills and speed bumps on the Custis too much.
One of tree root speed bumps knocked off my water bottle this morning.
June 19, 2012 at 9:19 pm #943471dasgeh
Participant@RESTONTODC 22721 wrote:
One of tree root speed bumps knocked off my water bottle this morning.
One knocked off one of my wheel reflectors the other day. Some days, I really miss my commute through ANC…
June 19, 2012 at 9:21 pm #943472dasgeh
ParticipantMy optimistic self hopes that the detour involves A-DOT blocking off a lane of Lee Hwy for cyclists (the third lane that appears where the bike lane disappears East bound, and one of the lanes East bound) from the Giant parking lot to Monroe. That would make my commute AWESOME!
June 20, 2012 at 12:09 pm #943490americancyclo
ParticipantSaw a detour sign pointing up to North Monroe this morning around 7:30am but no construction yet.
-