Upcoming Four Mile Run Trail closures

Our Community Forums Road and Trail Conditions Upcoming Four Mile Run Trail closures

Viewing 15 posts - 76 through 90 (of 222 total)
  • Author
    Posts
  • #993228
    CaseyKane50
    Participant

    Along the MVT at the Crystal City Connector

    [ATTACH=CONFIG]4716[/ATTACH]

    #993235
    chris_s
    Participant

    @CaseyKane50 76861 wrote:

    Along the MVT at the Crystal City Connector

    [ATTACH=CONFIG]4716[/ATTACH]

    I’m sending this photo to anyone who ever says the Arlington BAC can’t get anything done.

    #993237
    Subby
    Participant

    Still open this morning! :)

    #993239
    cyclingfool
    Participant

    @chris_s 76868 wrote:

    I’m sending this photo to anyone who ever says the Arlington BAC can’t get anything done.

    I was VERY pleasantly surprised to see that sign and a couple others as I rode home last night via the CC Connector.

    @Subby 76870 wrote:

    Still open this morning! :)

    When will they stop inconveniencing us and finally start inconveniencing us?!

    #993365
    PotomacCyclist
    Participant

    @Subby 76717 wrote:

    Yes – the bridge demolition has begun. They were making LOUD NOISES last night and this morning.

    Didn’t they already demolish a small part of the west side of the bridge already? The part on the south bank, next to the Rte. 1 trail?

    #993246
    dbb
    Participant

    They have about half of the south span down. This photo is from the south bank on Saturday afternoon.

    FMRBridgeDemo-20140208_zpsaba6cf6c.jpg

    #993250
    PotomacCyclist
    Participant

    This is a good month for people who like to watch bridge demolitions, I guess. In addition to the FMR bridge, crews are also demolishing the old Washington Blvd. bridge over Columbia Pike. (The old WB bridge is mostly gone now. The demolition is supposed to be finished next weekend.)

    #993421
    scorchedearth
    Participant

    The path under the bridges was still open as of yesterday evening.

    #993435
    OneEighth
    Participant

    This morning, too

    #993810
    dbb
    Participant

    Progress on the bridge demo. The south span is down and portions of the next span north is already down. Getting to the point where we are going to be affected.

    FMRBridgeDemo201402141_zps64059936.jpg

    FMRBridgeDemo201402143_zps5711babf.jpg

    #994142
    Yggdrasil
    Participant

    Open as of 3pm today.

    #994297
    Harry Meatmotor
    Participant

    Open as of 5:30am 2/21/14

    p.s. just joined here after finding this thread – will try to update as often as possible. i usually commute through 4MR to MVT 4-5 days a week.

    #994311
    DismalScientist
    Participant

    I think it will be awhile before they close the trail. I would imagine that taking down the boom containing debris in the stream and reinstalling it in the north part of the stream will the indication that the trail will close.

    #994316
    dbb
    Participant

    @Harry Meatmotor 77967 wrote:

    Open as of 5:30am 2/21/14

    p.s. just joined here after finding this thread – will try to update as often as possible. i usually commute through 4MR to MVT 4-5 days a week.

    Welcome to the forum! Much to discuss, share and learn here. The Eads Street detour is show in photos on the first page of this thread.

    #994336
    Harry Meatmotor
    Participant

    @dbb 77986 wrote:

    Welcome to the forum! Much to discuss, share and learn here. The Eads Street detour is show in photos on the first page of this thread.

    thanks for having me – been alternating between the two routes just to keep things interesting lately. thanks for the heads up, tho – it would be nice to see if someone could modify the signage at the water treatment plant from “DETOUR” to “MUST TAKE DETOUR” once they actually close the trail, and add a similar sign at the MVT-Crystal City connector intersection.