So the southern mulch path (coming off the trollheim) was closed and the trail reopened (and repaved!) along the west side of the parking lot. At the middle of parking lot (where the zig-zag would normally be), however, there’s a new (at least, this wasn’t the configuration last week), longer mulch path and it’s already in terrible shape. It’s basically mud with a thin layer of mulch. I avoided having to walk on 25s, but the high volume of bike traffic this morning was taking its toll.