Potomac Yard Trail Detour at Glebe Road

Our Community Forums Road and Trail Conditions Potomac Yard Trail Detour at Glebe Road

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #1061598
    Judd
    Participant

    Rode the detour a few days ago. The pipe wasn’t there at the time. Did you take a look to see what the purpose of the pipe is?

    Sent from my iPhone using Tapatalk

    #1061618
    CaseyKane50
    Participant

    @Judd 150232 wrote:

    Did you take a look to see what the purpose of the pipe is?[/quote]

    I stopped by the site this afternoon and chatted with the contractor. The pipes are for the water that is being pumped from the site. They have drilled wells down to 80 feet and are pulling out the water from the site, so that they can construct a four-level underground parking garage. Once the garage is built, a new headquarters for the National Industries for the Blind will be built on the site.

    The contractor thought the detour will be in place until June 2017. He told me that solar powered lights are scheduled to be installed along the detour path in the next several weeks.