The draft MoveDC plan was released today.
http://www.waba.org/blog/2014/05/cutting-ribbons-cutting-cake-oh-and-also-213-miles-of-new-bike-infrastructure-proposed/
…
“Mayor Gray used the opportunity to announce the release of the draft MoveDC plan. (This afternoon the moveDC website was running pretty slowly. You can view the Bicycle section on scribd here.)
There’s a lot to like and some room for improvement in this plan. Keep an eye out for a full analysis from our team soon. In the meantime, take a moment to celebrate this:
‘moveDC recommends 213 additional miles of bicycle infrastructure. The objective of the ultimate system is to provide a significant network so that bicycling is not a secondary mode, but a principal and preferred mode for travel.’
This a big deal. It represents a major commitment from DDOT to make the district a better, safer place to bike. Thanks to all of you who participated in the MoveDC process by taking the surveys and showing up at meetings.
The public comment period on this draft is open through July 6.”
MoveDC plan – Bicycle section (1st page is blank), on Scribd: http://www.scribd.com/doc/227265286/moveDC-Bicycle-Section
Bicycle section (1st page is blank), PDF format: http://www.wemovedc.org/resources/DraftPlan/B-Bicycle_Element.pdf
Entire plan and comment survey: http://www.wemovedc.org/