MVT construction at National Airport

Our Community Forums Road and Trail Conditions MVT construction at National Airport

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #1042988
    KWL
    Participant

    It looks like the trail surface bed is being prepared. Perhaps they really will have it open by Christmas.

    #1043433
    CaseyKane50
    Participant

    @KWL 129875 wrote:

    It looks like the trail surface bed is being prepared. Perhaps they really will have it open by Christmas.

    The rainy weather the last two days slowed things down, though an opening next week looks likely.

    View to the north
    [ATTACH=CONFIG]10290[/ATTACH]

    View to the south
    [ATTACH=CONFIG]10291[/ATTACH]

    #1043438
    MFC
    Participant

    No more col de wood chip, or shooting up the airport access road going northbound, trying to avoid the sewer grates.

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.