Mount Vernon Trail Bridge 12 Replacement in 2021
- This topic has 10 replies, 7 voices, and was last updated 4 years, 10 months ago by .
-
Topic
-
NPS has received funding from VDOT to replace Bridge 12 on the Mount Vernon Trail. Bridge 12 is the one on the south end of the trail with a steep grade on both sides that also includes sharp curves. The new bridge will provide for a flatter crave with out curves. More information and a few pictures at the link below:
https://mountvernontrail.org/2020/09/10/bridge-12-replacement-and-realignment/
Viewing 10 replies - 1 through 10 (of 10 total)
Viewing 10 replies - 1 through 10 (of 10 total)
- You must be logged in to reply to this topic.