    Thanks for sharing Henry. Rough timing though since I’ve noticed an uptick in use of the Bluemont Junction Trail since the closure of all the metro stations west of Ballston. Same kind of synergy we are having with 66 West construction work concurrent with limited shuttle service in lieu of metro. Surely Arlington and Fairfax are coordinating infrastructure master plan schedules?

    #1106095
    bentbike33
    Participant

    @SarahBee 201748 wrote:

    Surely Arlington and Fairfax are coordinating infrastructure master plan schedules?

    lol ;)

    #1106098
    dbb
    Participant

    Any chance we can get a bit of scope creep? The portion of the trail just north of Wilson where you emerge from under the roadway and then reconnect to the W&OD could use some help. Maybe 50-75 feet of asphalt.

    #1106104
    Steve O
    Participant

    @dbb 201758 wrote:

    Any chance we can get a bit of scope creep? The portion of the trail just north of Wilson where you emerge from under the roadway and then reconnect to the W&OD could use some help. Maybe 50-75 feet of asphalt.

    Where?

    #1106107
    Henry
    Keymaster

    @Steve O 201767 wrote:

    Where?

    Whew! I thought it was just me.

    Dana, while I suspect the answer will be no on the scope creep (it has been every time I’ve asked), can you be more specific about where this is? The Bluemont Connector does not go under a roadway at any point.

    Henry

    #1106108
    dbb
    Participant

    [ATTACH=CONFIG]21558[/ATTACH]

    #1106119
    Steve O
    Participant

    @dbb 201771 wrote:

    [ATTACH=CONFIG]21558[/ATTACH]

    If we want to creep that far, I’d also love to have all the root heaves just south of Wilson fixed up, too.

    #1106125
    dasgeh
    Participant

    That’s not just scope creep, the W&OD Trail is not Arlington’s. It belong to NOVA Parks. The good news is NOVA Parks has a nice budget for trail maintenance, so I’d shoot them a line about root heaves and other pavement issue on the trail.

    #1106514
    dbb
    Participant

    An update from ArCo Parks and Rec

    “The schedule update is that the on-call contractor is not available until the week of October 12”

    #1106516
    SarahBee
    Participant

    @Steve O 201783 wrote:

    If we want to creep that far, I’d also love to have all the root heaves just south of Wilson fixed up, too.

    Those root heaves are off the hook. I considered ordering custom yard signs saying “Free Vasectomy Ahead”, “All Terrain Vehicles Only”, “Have Your Dentist’s # Handy”, “Helmet Buckled?”, “Hold On Tight”, “Secure Loose Change Now”, “Who Needs Bouncy Castles”, “Bend Those Knees, Please!”, etc. Still may do it :)

    #1114601
    Relwal Noj
    Participant

    Was this paving work ever completed?

    #1114631
    Sunyata
    Participant

    @Relwal Noj 211222 wrote:

    Was this paving work ever completed?

    Yes. It is nice and smooth now.

    #1114895
    DrP
    Participant

    So the project to re-pave the Bluemont Trail (not the bit between Bluemont and Wilson as I think many were discussing above) has started in earnest today (there were “trail closed” signs all last week, but the trail never seemed closed). Today the bit from Wilson to N Emerson was completely closed and re-rounte and they closed the trail down to Illinois (I think that one). They claim they will be done in a week to 10 days. They are re-routing in three batches, but no idea how long each will be.

    https://www.arlingtonva.us/Government/Projects/Project-Types/Parks-Projects/Bluemont-Junction-Trail-Milling-and-Repaving?BestBetMatch=bluemont%20trail|d2f86bd7-6525-489c-b1eb-fbe9efd2bbfb|6244aa32-b2d4-441b-b20e-1096256a4671|en-US

    #1114940
    CaseyKane50
    Participant

    @DrP 211632 wrote:

    So the project to re-pave the Bluemont Trail (not the bit between Bluemont and Wilson as I think many were discussing above) has started in earnest today (there were “trail closed” signs all last week, but the trail never seemed closed). Today the bit from Wilson to N Emerson was completely closed and re-rounte and they closed the trail down to Illinois (I think that one). They claim they will be done in a week to 10 days. They are re-routing in three batches, but no idea how long each will be.

    https://www.arlingtonva.us/Government/Projects/Project-Types/Parks-Projects/Bluemont-Junction-Trail-Milling-and-Repaving?BestBetMatch=bluemont%20trail|d2f86bd7-6525-489c-b1eb-fbe9efd2bbfb|6244aa32-b2d4-441b-b20e-1096256a4671|en-US

    Trail has been repaved from the W&OD Trail to Wilson Boulevard.

    1e994384a161a640d58fc79737c3c99b.jpg

    ce24e5510fc5d986c334a5ae4887d686.jpg
    ceec482904d5f5515d10464562e7f874.jpg

    #1114941
    CaseyKane50
    Participant

    And now the paving is complete. A wonderful smooth ride from end-to-end on the Bluemont Trail63fea77dda8c40302f21a4e54a0cda01.jpg

    9eaf58c1b6db68573997713c3f211ef2.jpg

    951214a9b2ec371130a7ff0bcb1c26d2.jpg

    512dba2293481ca2498dd10c12a932aa.jpg

Viewing 15 posts - 1 through 15 (of 16 total)
  • You must be logged in to reply to this topic.