Milling and Repaving Bluemont Connector Trail in Mid-August 2020
Our Community › Forums › Road and Trail Conditions › Milling and Repaving Bluemont Connector Trail in Mid-August 2020
- This topic has 16 replies, 10 voices, and was last updated 3 years, 6 months ago by
Relwal Noj.
-
AuthorPosts
-
June 30, 2020 at 11:53 pm #1106088
SarahBee
ParticipantThanks for sharing Henry. Rough timing though since I’ve noticed an uptick in use of the Bluemont Junction Trail since the closure of all the metro stations west of Ballston. Same kind of synergy we are having with 66 West construction work concurrent with limited shuttle service in lieu of metro. Surely Arlington and Fairfax are coordinating infrastructure master plan schedules?
July 1, 2020 at 3:30 pm #1106095bentbike33
Participant@SarahBee 201748 wrote:
Surely Arlington and Fairfax are coordinating infrastructure master plan schedules?
lol
July 1, 2020 at 7:48 pm #1106098dbb
ParticipantAny chance we can get a bit of scope creep? The portion of the trail just north of Wilson where you emerge from under the roadway and then reconnect to the W&OD could use some help. Maybe 50-75 feet of asphalt.
July 2, 2020 at 1:44 pm #1106104Steve O
Participant@dbb 201758 wrote:
Any chance we can get a bit of scope creep? The portion of the trail just north of Wilson where you emerge from under the roadway and then reconnect to the W&OD could use some help. Maybe 50-75 feet of asphalt.
Where?
July 2, 2020 at 5:29 pm #1106107Henry
Keymaster@Steve O 201767 wrote:
Where?
Whew! I thought it was just me.
Dana, while I suspect the answer will be no on the scope creep (it has been every time I’ve asked), can you be more specific about where this is? The Bluemont Connector does not go under a roadway at any point.
Henry
July 2, 2020 at 5:59 pm #1106108dbb
Participant[ATTACH=CONFIG]21558[/ATTACH]
July 6, 2020 at 2:02 am #1106119Steve O
Participant@dbb 201771 wrote:
[ATTACH=CONFIG]21558[/ATTACH]
If we want to creep that far, I’d also love to have all the root heaves just south of Wilson fixed up, too.
July 6, 2020 at 3:45 pm #1106125dasgeh
ParticipantThat’s not just scope creep, the W&OD Trail is not Arlington’s. It belong to NOVA Parks. The good news is NOVA Parks has a nice budget for trail maintenance, so I’d shoot them a line about root heaves and other pavement issue on the trail.
September 11, 2020 at 2:38 pm #1106514dbb
ParticipantAn update from ArCo Parks and Rec
“The schedule update is that the on-call contractor is not available until the week of October 12”
September 11, 2020 at 3:09 pm #1106516SarahBee
Participant@Steve O 201783 wrote:
If we want to creep that far, I’d also love to have all the root heaves just south of Wilson fixed up, too.
Those root heaves are off the hook. I considered ordering custom yard signs saying “Free Vasectomy Ahead”, “All Terrain Vehicles Only”, “Have Your Dentist’s # Handy”, “Helmet Buckled?”, “Hold On Tight”, “Secure Loose Change Now”, “Who Needs Bouncy Castles”, “Bend Those Knees, Please!”, etc. Still may do it
August 23, 2021 at 2:29 pm #1114601Relwal Noj
ParticipantWas this paving work ever completed?
August 24, 2021 at 12:31 pm #1114631Sunyata
Participant@Relwal Noj 211222 wrote:
Was this paving work ever completed?
Yes. It is nice and smooth now.
November 8, 2021 at 2:30 pm #1114895DrP
ParticipantSo the project to re-pave the Bluemont Trail (not the bit between Bluemont and Wilson as I think many were discussing above) has started in earnest today (there were “trail closed” signs all last week, but the trail never seemed closed). Today the bit from Wilson to N Emerson was completely closed and re-rounte and they closed the trail down to Illinois (I think that one). They claim they will be done in a week to 10 days. They are re-routing in three batches, but no idea how long each will be.
November 14, 2021 at 8:11 pm #1114940CaseyKane50
Participant@DrP 211632 wrote:
So the project to re-pave the Bluemont Trail (not the bit between Bluemont and Wilson as I think many were discussing above) has started in earnest today (there were “trail closed” signs all last week, but the trail never seemed closed). Today the bit from Wilson to N Emerson was completely closed and re-rounte and they closed the trail down to Illinois (I think that one). They claim they will be done in a week to 10 days. They are re-routing in three batches, but no idea how long each will be.
Trail has been repaved from the W&OD Trail to Wilson Boulevard.
November 16, 2021 at 4:04 pm #1114941CaseyKane50
ParticipantAnd now the paving is complete. A wonderful smooth ride from end-to-end on the Bluemont Trail
-