I need examples of bike/ped path projects with time and cost information
- This topic has 1 reply, 2 voices, and was last updated 9 years, 3 months ago by .
-
Topic
-
This is a cut and paste from an acquaintance who works at Federal Highways. Please send info to Bruce Moody at Bruce.Moody@dot.gov.
Hello my fellow bike/ped people!
I’m doing some research on project time and costs are for 1 mile bike / ped paths. Specifically I am looking for similar examples like the project where the city (Milwaukie Oregon) is restriping an existing 1 mile segment and adding separated protected buffered side bike/ped path on the west side of the street. See pictures below and project narrative attached.
I’m looking for examples of completed projects that are similar but they don’t have to be identical (they could be longer or shorter in length, etc.) and funding source doesn’t matter (Local, State, Federal).
If you know of any completed projects in your state that you have some details of time and cost, etc., then please email me.
Current picture:
[ATTACH=CONFIG]11449[/ATTACH]Project conception:
[ATTACH=CONFIG]11450[/ATTACH]Thank you!
Bruce
US DOT – Federal Highway Administration (Oregon and Washington Divisions)
- You must be logged in to reply to this topic.