@americancyclo 20469 wrote:
I was out of town for a while, so this was the first day I rode the Custis eastbound over 66, and I noticed that the hard lip of the bridge (at the top of the hill in rosslyn) has been filled in with asphalt. So smooth now!
Nice work Tim!
That was pretty rad to see, actually had my arms braced for the traditional “bunny hop for freedom.” However, the little engineer inside my head kept saying “What about thermal expansion and contraction?” I hate that guy.