Boards Repaired on W&OD Bridge – Further work may be needed

Our Community Forums Road and Trail Conditions Boards Repaired on W&OD Bridge – Further work may be needed

Viewing 9 posts - 1 through 9 (of 9 total)
  • Author
    Posts
  • #1032984
    rcannon100
    Participant

    Erin, did they say HOW it was damaged? It wasnt from Parks driving their trucks over the bridges, was it?????????

    #1032985
    Erin Potter
    Participant

    They did not, so we are left with an air of mystery…

    #1032987
    consularrider
    Participant

    @rcannon100 119024 wrote:

    Erin, did they say HOW it was damaged? It wasnt from Parks driving their trucks over the bridges, was it?????????

    Of course it was.

    Second bridge south, that would be the one by the Glencarlyn bathroom? Think they’ll put up detour signs to the 4MR trail? If the ford there is flooded, you can take the trail that goes around the bathroom and comes out by the dog exercise area and take the narrow bridge with the most useless bollard in Arlington county to get back over to the W&OD.

    #1032988
    Steve O
    Participant

    @consularrider 119027 wrote:

    Of course it was.

    Second bridge south, that would be the one by the Glencarlyn bathroom?

    Glen Carlyn is the 3rd bridge.
    To bypass this one requires exiting immediately south of 50, going up almost to the neighborhood and then hard left back down to just before Glen Carlyn.

    #1032994
    rcannon100
    Participant

    From the asphalt transition onto the boards, the first boards received substantial damage – no other parts of the bridge apparently damaged (like the rais if a tree had fallen on it). Easily supports the hypothesis that something attempted to drive OVER the bridge that should not have.

    #1033003
    sjclaeys
    Participant

    @rcannon100 119034 wrote:

    From the asphalt transition onto the boards, the first boards received substantial damage – no other parts of the bridge apparently damaged (like the rais if a tree had fallen on it). Easily supports the hypothesis that something attempted to drive OVER the bridge that should not have.

    [ATTACH=CONFIG]8977[/ATTACH]

    #1033026
    consularrider
    Participant

    This morning that W&OD bridge over Four Mile Run was closed off with yellow caution tape with detour signs to the 4MRT (the good climb at Glencarlyn). Probably just trying to help with Kill Bill training.

    Then there was the truck completely blocking the parking lot access there because they were going to paint and “you wouldn’t want anyone to get paint on themselves,” not that anyone was actively painting at 9 AM. Should have had cones or a warning sign at the top for the drive down from Harrison St.

    #1033029
    rcannon100
    Participant

    @sjclaeys 119043 wrote:

    [ATTACH=CONFIG]8977[/ATTACH]

    Perhaps ~ However

    Ron-Burgundy-This-Just-In-No-One-Cares.jpg

    Snark is far more fascinating than fact.

    #1033054
    vern
    Participant

    The bridge was open and clear early this evening. A number of boards had been replaced.

Viewing 9 posts - 1 through 9 (of 9 total)