Beaver Pond Restoration – and its impact on cycling

Our Community Forums Arlington Bicycle Advisory Committee Beaver Pond Restoration – and its impact on cycling

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • #955339
    chris_s
    Participant

    Scroll down – the revised concept plan is basically what is going forward. A bunch of us weighed in on the concept plans back in 2011 because it was looking like the “interpretive features” were going to cause pedestrians to congregate on the trail.

    #955388
    dbb
    Participant

    Took a look at the revised concept plan. Hoping that the planners are selecting trees that beavers don’t like otherwise the “evergreen buffer” will become dinner. The idea of a “turtle basking station” was kind of neat. Most turtles just use a log or a rock but the turtles at the beaver pond will have basking stations. Sweet!

    #955390
    mstone
    Participant

    @dbb 35672 wrote:

    The idea of a “turtle basking station” was kind of neat. Most turtles just use a log or a rock but the turtles at the beaver pond will have basking stations. Sweet!

    I think I’m going to start calling my comfy chair the “basking station”.

    #955517
    chris_s
    Participant

    I was flipping through the County’s Capital Improvement Plan looking for something else and ran across a section on the Ballston Beaver Pond. The description there makes it sounds like only the storm water parts of the project are being done now and the “boardwalks, trails and interpretation” will be done Fiscal Year 2021 since the funding they are using for construction right now can only be used to improve storm water runoff. I’ll quote the project description here:

    13 Ballston Pond
    Project Description
    The Ballston Pond was originally designed and constructed as a stormwater detention facility when the I-66 highway was built, to collect and slow down the stormwater runoff from I-66. Over the years, the pond has been filling up with sediments deposited by the stormwater runoff, which slows down when it reaches the pond. Retrofitting the Ballston Beaver Pond is a high priority project in the County’s stormwater management program. The plan that has been designed incorporates features such as boardwalks, trails and interpretation which are unable to be funded through the County’s watershed funds. This project is for the final design and implementation of the trails and boardwalks.

    #955527
    Rootchopper
    Participant

    This is interesting because the National Park Service has been waging a war with beavers on the Mount Vernon Trail north of Slaters Lane for the last year. Whenever the beavers dam up the creek running under the boardwalk there, the Park Service comes along and breaches the dam. I think they pulled the plug on the dam today because water was flowing through a sizeable gap in the dam. I’m sure they have their reasons but I kind of like that area when it’s filled with water.

Viewing 5 posts - 1 through 5 (of 5 total)
  • You must be logged in to reply to this topic.