Ballston Connector closed? Or the trail on the other side of the pond?

Our Community Forums Road and Trail Conditions Ballston Connector closed? Or the trail on the other side of the pond?

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #1115014
    CaseyKane50
    Participant

    Information from Arlnow.com https://www.arlnow.com/2021/12/02/long-awaited-renovations-to-ballston-beaver-pond-begin/

    edf2b1a9a873ab258b40236689799afa.jpg

    Work began yesterday (Wednesday) on the long-delayed Ballston Beaver Pond remediation project — but no busy beavers will be involved.

    The $4.2 million, 18-month project approved by the County Board this summer will retrofit the pond, originally built in 1980 to collect stormwater runoff from I-66. Today, sediment in the pond prevents detention, and it instead has become home to abundant wildlife, including beavers, according to a county report.
    The project, expected to wrap up in July 2023, aims to improve stormwater retention and the wildlife habitat by restoring native plant species and adding habitat features. There will be a new observation platform with educational signage, seating and a reconstructed trail with bike racks.
    Arlington County says the new two-acre wetland area will provide stormwater treatment to 460 acres of land in the Lubber Run watershed, and “is among the County’s most effective opportunities to achieve its water quality objectives and meet its regulatory requirements.”
    This month, the construction contractor will be setting up the site, county project manager Aileen Winquist tells ARLnow. Excavation will begin next year.
    “From now until the end of the year, neighbors will see the contractor bringing in equipment and setting up the boundaries of the construction area,” she said. “In the new year, neighbors will begin to see dump trucks full of sediment removed from the pond leaving the site.”
    Public access will be limited as well. The grass area within the park will be off-limits, as it will be used for construction. A bike and pedestrian detour will reroute trail users from Washington Blvd to the Custis Trail and along the south side of the pond.
    The detour will be in place for the entirety of construction, Winquist says.

    #1115059
    Steve O
    Participant

    @DrP 211821 wrote:

    The signs this morning were poorly placed and would be easy to run into the feet in the dark, especially the one at the Fairfax Dr end. They take up a lot of the trail. Any way these can be placed to not cause hazards?

    lumberjack, v. – moving a human-placed obstruction on a trail, sidewalk or bike lane that was originally placed by someone oblivious to the inconvenience or danger it may cause to people not in cars. Generally performed in the spirit of considerate vigilantism.

    #1115061
    Judd
    Participant

    @Steve O 211875 wrote:

    lumberjack, v. – moving a human-placed obstruction on a trail, sidewalk or bike lane that was originally placed by someone oblivious to the inconvenience or danger it may cause to people not in cars. Generally performed in the spirit of considerate vigilantism.

    Everyone needs a little Lumberjack in their lives.

    Sent from my iPhone using Tapatalk

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.