Trollheim Bridge Cleaning on Saturday, October 10th

Our Community Forums Events Trollheim Bridge Cleaning on Saturday, October 10th

Viewing 11 posts - 1 through 11 (of 11 total)
  • Author
    Posts
  • #1106649
    chris_s
    Participant

    The GoFundMe says the campaign is “not accepting donations”

    #1106651
    Judd
    Participant

    @chris_s 202439 wrote:

    The GoFundMe says the campaign is “not accepting donations”

    Doh! There’s an issue on the back end with using the Charity GoFundMe site that I’m working on resolving. Going to edit out the donation link in the interim.

    Sent from my iPhone using Tapatalk

    #1106663
    Judd
    Participant

    Great group of volunteers for Trollheim cleaning. We scrubbed the S Curve area on the bridge and the portion that leads to TR Bridge. We managed to get a lot of gunk up. If you look in the third picture you can see the difference in the deck from in front of the squeegee to the back of the squeegee.

    We should have an event in the near future to perform some replacement and repair on the deck boards.

    a4812ac81186451e805874f8693d3bea.jpg

    2407404c1288a44f2c319ad2274eff0d.jpg

    b1bf2636590181f056368b3b843ad7ef.jpg

    994f2b2fb3ad8471c1baeb9d0e015d3c.jpg

    Sent from my iPhone using Tapatalk

    #1106664
    bikesnick
    Participant

    Thank You so much cleaning.
    (From someone who has fallen there.)

    @Judd 202453 wrote:

    Great group of volunteers for Trollheim cleaning. We scrubbed the S Curve area on the bridge and the portion that leads to TR Bridge. We managed to get a lot of gunk up. …

    #1106671
    Judd
    Participant

    I went out again yesterday to give the boards an extra scrub and squeegee in the rain and was able to get more gunk up.

    I counted bikes coming through in the rain. 21 folks made it through without any falls.

    I also started on removing gunk from in between the boards after I noticed the deck wasn’t draining yesterday. Most of the gaps were sealed with twigs and decomposed leaf litter. A picture is below. I hope to get it finished at the top volunteer event.

    8896b99ce0df475308f88c5191f3b471.jpg

    Sent from my iPhone using Tapatalk

    #1106675
    ChristoB50
    Participant

    Fantastic! Any update on the GoFundMe issue?

    #1106690
    Judd
    Participant

    @ChristoB50 202469 wrote:

    Fantastic! Any update on the GoFundMe issue?

    We are back up at https://www.gofundme.com/f/a-crash-free-trollheim

    Sent from my iPhone using Tapatalk

    #1106768
    huskerdont
    Participant

    Way late, but I threw a few in. Saw the article on ArlNow.

    I haven’t been by here much lately b/c not much has been going on, then I got logged out and could never seem to log back in. It’s the Internet’s fault, I’m sure. ;0

    #1106776
    Judd
    Participant

    @huskerdont 202607 wrote:

    Way late, but I threw a few in. Saw the article on ArlNow.

    I haven’t been by here much lately b/c not much has been going on, then I got logged out and could never seem to log back in. It’s the Internet’s fault, I’m sure. ;0

    Saw your name come through yesterday on the GoFundMe. Thank you for your support and the positive comments in the commenter section.

    #1106775
    Judd
    Participant

    I just added some additional volunteer events. We’re getting started on the next problematic bridge by the power plant in Alexandria. This is the bridge with the chain link fencing enclosing it and the zig zags that make it hard to see oncoming traffic. The bridge is currently being swallowed by kudzu making the sight lines even worse and increasing the potential for damage from the weight of the vines. The new events will be for removing these vines.

    Full event list at:
    https://mountvernontrail.org/events/

    #1106802
    Judd
    Participant

    Volunteers reattached loose boards on Trollheim last Saturday. We got about half of the bridge done and put in around 400 screws. We also hammered down any nail pops. We also swept all the leaves off the bridge.

    Board replacement will occur tomorrow before a final event on 12/6 to fix the remaining loose deck boards.

    To support ongoing bridge work on the Mount Vernon Trail, support the GoFundMe at https://www.gofundme.com/f/a-crash-free-trollheim

    All volunteer events are posted at MountVernonTrail.org/events

    2987da2f5b182c4060399427f38afa3d.jpg

    99d539614956b02f48711d9483d2e41f.jpg

    4bcdb307636cbbf2e5013255988023f6.jpg

    Sent from my iPhone using Tapatalk

Viewing 11 posts - 1 through 11 (of 11 total)
  • You must be logged in to reply to this topic.