April 30, 2015 at 3:35 pm #1029079
PotomacCyclist
ParticipantIt’s still April though.
April 30, 2015 at 4:16 pm #1029094consularrider
ParticipantMay 1, 2015 at 4:15 pm #1029193Crickey7
ParticipantPuddles on the CCT. Which I know because the rider I was drafting hit every single one. Which I did not do when he was drafting me.
May 6, 2015 at 3:09 pm #1029438rcannon100
ParticipantSaturday starting 9.30 AWLA Walk for the Animals will be talking place in Bluemont Park in Arl, which is on 4MR and WOD
http://www.arlnow.com/2015/05/06/walk-for-the-animals-returns-on-saturday/
May 6, 2015 at 4:07 pm #1029443Emm
Participant@rcannon100 115168 wrote:
Saturday starting 9.30 AWLA Walk for the Animals will be talking place in Bluemont Park in Arl, which is on 4MR and WOD
http://www.arlnow.com/2015/05/06/walk-for-the-animals-returns-on-saturday/
Well that answers the internal debate I’ve had since Monday– 50-60 mile bike ride early Saturday on the W&OD or attempt to finish building my garden that day (it’s an all day project at the minimum). I’ll just hope the weather is nice Sunday and I’ll ride my bike down the W&OD then…
May 12, 2015 at 7:50 pm #1029793consularrider
ParticipantCan some report on the status of the asphalt repair on the 4MRT extension between the I-395 and West Glebe Rd underpasses. When I went through about 8:30 a couple trucks had just arrived. When I went back through at 9:30, the crew was working on the problem with the concrete to asphalt transition closest to I-395 and the trail was blocked.
May 12, 2015 at 8:48 pm #1029795chris_s
Participantconsularrider;115583 wrote:can some report on the status of the asphalt repair on the 4mrt extension between the i-395 and west glebe rd underpasses. When i went through about 8:30 a couple trucks had just arrived. When i went back through at 9:30, the crew was working on the problem with the concrete to asphalt transition closest to i-395 and the trail was blocked.Fixed! Not quite as smooth as immediately post-repair last time they did it, but 10x better than it was.
May 13, 2015 at 1:53 pm #1029858CaseyKane50
Participant@chris_s 115586 wrote:
Fixed! Not quite as smooth as immediately post-repair last time they did it, but 10x better than it was.
Pictures
[ATTACH=CONFIG]8587[/ATTACH]
[ATTACH=CONFIG]8588[/ATTACH]
May 18, 2015 at 5:12 pm #1030401bobco85
ParticipantOn Wilson Blvd in the Bluemont neighborhood, I noticed that the road is being repaved as part of the following project that will add bike lanes between the street behind the Safeway (Frederick St) and Bluemont Park (Manchester Street): http://projects.arlingtonva.us/projects/wilson-boulevard-improvements/
Last I checked, no paint had been laid, but I will get some pics later this afternoon of the situation.
-