Update: I didn’t hear back from MNCPPC or VDOT, but did see that the bridge itself was being plowed yesterday afternoon. The bridge has been plowed and the trail on the Maryland side, including the overpass and the ramp down to the beginning of the bridge, has been plowed and salted. This morning, the bridge had a thin layer of snow and ice on it was rideable with studded snow tires.