    Hi. Eads St in Crystal City was repaved in September, I believe, yet the lanes are still unmarked. No pedestrian crossings and no bicycle lane. Whereas my preference would be to stay on MVT and 4MR, I have found that the construction and sidewalk closure along Glebe makes crossing it quite unpalatable so I occasionally ride Eads St. I haven’t been hit yet, it’s true, but I feel a bit exposed and wonder what is taking so long.

    Perhaps when repaving a road, there should be a plan to remark it within some period of time.

    I noticed the other day heading north on Eads toward 23rd that there are lots of white markings on the brand new pavement – but they aren’t crosswalks and bike lanes – and instead appear to be the markings for new construction. I hope not, but it wouldn’t be the first time I’ve seen new pavement busted wide open for sub-surface repairs.

    #1015787
    chris_s
    Participant

    The county definitely screwed this one up. At this point it’ll be extremely difficult to get anything down with winter upon us.

    On the bright side, when it gets remarked it’ll be a cycletrack.

    #1015792
    83b
    Participant

    I drove the 23rd St to 15th St stretch of Eads this weekend and it was terrifying without the lane markings. I can’t imagine trying to bike through there right now.

    #1015795
    chris_s
    Participant

    From the horse’s mouth:

    I’m told we have between two and three pavement marking crews out working on Eads St today. It may not get finished today but they should make substantial progress. I’ll know more when I get a chance to see it and I can fill you in then.

    #1015807
    chris_s
    Participant

    [ATTACH=CONFIG]7081[/ATTACH]
    Photo by @bikepedantic

    #1015814
    vern
    Participant

    @chris_s 100765 wrote:

    [ATTACH=CONFIG]7081[/ATTACH]
    Photo by @bikepedantic

    Awesome! I’m very glad to discover that I am a very poor interpreter of street markings that precede the actual work.

    #1015825
    PotomacCyclist
    Participant

    I saw the center two-way turn lane, finally marked on a section of Eads. It did not follow those temporary markings that have been there for several weeks. The lane markings are not complete, even though the temporary signs on the parking meters say that the parking spaces would be unavailable from 11/20 to 11/25, 10 to 5 each day. The work crews are going to need access to those curb-side lanes if they are marking the new cycletrack lanes.

    #1015826
    PotomacCyclist
    Participant

    @vern 100730 wrote:

    I noticed the other day heading north on Eads toward 23rd that there are lots of white markings on the brand new pavement – but they aren’t crosswalks and bike lanes – and instead appear to be the markings for new construction. I hope not, but it wouldn’t be the first time I’ve seen new pavement busted wide open for sub-surface repairs.

    The section of Eads around 18th St. has been dug up in a few spots, just after it was repaved. There is currently an open trench near the intersection with 18th. (The lane was blocked off with orange cones.) Or at least the trench was open on Tuesday morning.

    With the ongoing excavation and construction work going on at the site of the former post office building on the NW side of the intersection, there could be more temporary cuts in Eads. The curb-side lane is also blocked off because of the excavation work, so the cycletrack lane won’t be able to be marked on the southbound lane, heading toward 18th St. The excavation work crews haven’t dug very deep yet, so I’d imagine that the excavation work will continue on for some time, as in months, not weeks.

    #1016040
    CaseyKane50
    Participant

    A work crew was out this morning working at the corner of Eads and 23rd Street putting down the line markings. It appears that the line markings are in place southbound from the corner of 18th Street to Fort Scott Street. Northbound still has areas that need the line markings. Still to come are the stanchions separating the parking areas from the bike lanes, bike symbols and signs.

    The picture below was taken on Saturday looking south from 18th Street.

    [ATTACH=CONFIG]7112[/ATTACH]

    #1016194
    vern
    Participant

    There were several tour buses parked in the new bike lanes on Eads this a.m. I didn’t stop to take a pic, but if they are there tomorrow I will and forward it on to the proper authorities.

    #1016195
    CaseyKane50
    Participant

    One car has figured out the bike lane is for bikes.
    [ATTACH=CONFIG]7113[/ATTACH]

    Meanwhile, even with the bike lane marked…
    [ATTACH=CONFIG]7114[/ATTACH]

    No parking signs were posted for tomorrow and Thursday along Eads. Perhaps the stanchions and instructional signs will be going up to help motorists find the correct places to park.

    #1016201
    Harry Meatmotor
    Participant

    @CaseyKane50 101174 wrote:

    Meanwhile, even with the bike lane marked…
    [ATTACH=CONFIG]7114[/ATTACH]

    Who’s with me?

    i know, i know, not very dirt-like…

    #1016216
    83b
    Participant

    Thank you for the pictures. I appropriated them to respond to an aggrieved driver on Twitter. Arlington apparently did show up to ticket every car on the block.

    That guys cropping job on his pictures while saying there is “no guidance” on the new parking pattern is the most disingenuous thing I’ve seen in awhile.

    #1016272
    CaseyKane50
    Participant

    No parking signs and tickets seem to have done the trick!

    [ATTACH=CONFIG]7126[/ATTACH]

    #1016273
    PotomacCyclist
    Participant

    I walked by there last evening. The entire bike lane was full of parked cars again. But this morning, the bike lane was empty.

Viewing 15 posts - 1 through 15 (of 34 total)