Speak up for a Bridge for the W&OD over 29 in (almost) Falls Church
- This topic has 3 replies, 4 voices, and was last updated 9 years, 5 months ago by .
-
Topic
-
*MEETINGS TONIGHT AND THURSDAY* We need people in the room to speak up for the need for a grade-separated crossing for the bike trail.
The Virginia Department of Transportation (VDOT) will host design public hearings for the public to review and provide comments on the preliminary design plans and the findings of the Environmental Assessment (EA) for the the Transform 66 Inside the Beltway Eastbound Widening Project.
One of the proposed designs is a pedestrian and bicycle grade-separated overpass of the W&OD Trail at the intersection of Washington Boulevard/Lee Highway and Fairfax Drive. See page 3-42 in the Eastbound Widening Environmental Assessment document. This is a critical component of the trail, public support for this overpass would help ensure it is built.
If you are unable to attend one of the meetings, you can also provide input with the on-line form.
Meeting Schedule
Monday, December 5, 2016 (6:30-8:30 p.m.)
Washington-Lee High School Cafeteria
1301 N. Stafford Street, Arlington, VA 22201If the above meeting is cancelled due to inclement weather, the alternate date will be Monday, December 12, 2016 at Arlington County, 2100 Clarendon Boulevard, Room 307, Arlington, VA 22201.
Thursday, December 8, 2016 (6:30-8:30 p.m.)
Mary Ellen Henderson Middle School Cafetorium
7130 Leesburg Pike, Falls Church, VA 22043If the above meeting is cancelled due to inclement weather, the alternate date will be Thursday, December 15, 2016 at the VDOT Northern Virginia District Office, 1st Floor, 4975 Alliance Drive, Fairfax, VA 22030.
http://inside.transform66.org/meetings/default.asp